Amazon Energy

18 projects

Project case studies

Kwale Flare Down ProjectCompleted

EPICOMGas Solutions

Kwale Flare Down Project

Nigerian Agip Oil Company (NAOC)

Challenge
About 20 MMSCFD of associated gas (10 MMSCFD atmospheric and 10 MMSCFD low-pressure) was being flared at the Kwale gas plant.
Solution
We upgraded the plant and designed and built four compressors, two atmospheric and two low-pressure, to route the recovered gas to the MP gas header and on through the existing pipeline to the Ob/Ob gas plant.
Result
Gas that was burned off is now delivered as fuel gas, cutting flaring and emissions.

20MMSCFD of flared gas recovered

Akri Flowstation Gas Recovery ProjectCompleted

EPICOMGas Solutions

Akri Flowstation Gas Recovery Project

Nigerian Agip Oil Company (NAOC)

Challenge
About 33 MMSCFD of associated gas was being flared at the Akri Flowstation.
Solution
We recovered the flared gas for delivery to the Kwale Gas Plant through a 24-inch gas pipeline of about 18 km into the existing Kwale to Ob/Ob pipeline, including a 3 km river crossing.
Result
Commissioned in March 2019.

33MMSCFD of flared gas recovered

NLNG Train 7 FEED ProjectCompleted

Engineering

NLNG Train 7 FEED Project

Nigeria LNG Limited

Challenge
NLNG set out to expand its six-train facility with a seventh liquefaction train, a new common liquefaction unit for excess treated gas from the existing trains, a new export jetty and all brownfield interconnections.
Solution
We carried out front-end engineering design as part of the SAIPEM, Dover and Amazon Energy consortium, 2018 to 2019.
Result
FEED delivered for one of the largest gas projects in Nigeria.

106,086engineering man-hours

River Niger Gas Pipeline CrossingCompleted

EPICOM

River Niger Gas Pipeline Crossing

Challenge
Gas had to be delivered across the River Niger on a demanding schedule.
Solution
We engineered and built an 18.5 km, 24-inch pipeline, including the river crossing, with a single team managing design, procurement and construction.
Result
Completed in four months and now delivering gas.

4months to complete 18.5 km

Gas Supply to Abeokuta CustomersCompleted

EPICOMGas SolutionsAutomation

Gas Supply to Abeokuta Customers

Nigerian Gas Company

Challenge
Eight industrial customers needed a reliable, metered gas supply.
Solution
Gas now flows to all eight customers through a fully metered, controlled system (2014).
Result
Gas now flows to all eight customers through a fully metered, controlled system.

8customers connected

Escravos Terminal and IBP Rehabilitation, FEED and DEDCompleted

Engineering

Escravos Terminal and IBP Rehabilitation, FEED and DED

WAGL Energy Limited

Challenge
The existing facilities at the NPSC Escravos Crude Oil Terminal and Import Berth Platform (IBP) needed rehabilitation.
Solution
Forensic audit of the existing facilities, followed by front-end and detailed engineering design for the rehabilitation works (2020).
Result
Rehabilitation engineered from a forensic audit of the existing facilities.

FEED + DEDfrom forensic audit to detailed design

Njaba Field DevelopmentCompleted

Engineering

Njaba Field Development

Addax Petroleum Development

Challenge
Addax planned to drill and produce seven additional wells and needed the facilities to bring them on stream.
Solution
Detailed engineering of 12-inch by 18 km production and 6-inch by 18 km gas lift pipelines, the pipeline end facilities and the process facilities, with tie-ins to the existing Izombe flow station.
Result
A phased development ready to increase production and processing capacity.

7wells tied in to the facilities

Offshore Platform Integrity ProgrammeCompleted

Asset IntegrityEngineering

Offshore Platform Integrity Programme

Mobil Producing Nigeria

Challenge
Ageing offshore platforms needed their structural and production integrity restored.
Solution
Like-for-like detailed engineering on eight platforms at Ubit and four platforms with their link bridges on the Etim-Inim Life Extension Phase 2, with work packs and job cards prepared for construction.
Result
Restoration engineered and packaged, ready for safe execution offshore.

12offshore platforms

Qua Iboe Terminal Engineering VerificationCompleted

EngineeringEPICOM

Qua Iboe Terminal Engineering Verification

Mobil Producing Nigeria

Challenge
The operator needed assurance that new dormitories, utilities and offices were designed and built to standard.
Solution
Project management consultancy with engineering verification and site surveillance throughout.
Result
Facilities delivered to applicable industry and company standards.

QA/QCassurance from design to handover

South Offshore Area Water Disposal, FIM Phase 1Completed

Engineering

South Offshore Area Water Disposal, FIM Phase 1

Chevron Nigeria

Challenge
Construction needed engineering support to keep moving without delay.
Solution
As the constructor, we carried out follow-on engineering, prepared construction work packs and resolved construction queries.
Result
Construction kept on track with engineering answers on hand.

FIM 1follow-on engineering as constructor

Also in our record

Project reference list

Recent projects executed for operators and national companies, most recent first.

YearProjectClient
2026Olomoro Infield Water Disposal Project, FEEDHeritage Energy Operational Services Limited (HEOSL)
2026Provision of Insol Chemical Wax Remediation Treatment in Abura Well 9S, OML 65NNPC E&P Limited (NEPL)
2025BOP Structural Restoration ProjectSeplat Energy Producing Nigeria Unlimited (SEPNU)
2025Small Bore Connection Bracing Program ProjectSeplat Energy Producing Nigeria Unlimited (SEPNU)
2025Oweh & Uzere As-Built and Laser Scanning ProjectHeritage Energy Operational Services Limited (HEOSL)
2025Olomoro Infield Water Disposal Project, Conceptual DesignHeritage Energy Operational Services Limited (HEOSL)
2025Gbaran EPF Optimization ProjectRenaissance (SPDC)
2025Gbaran Crude Export Autosampler Installation ProjectRenaissance (SPDC)
2025Adibawa Autosampler Installation ProjectRenaissance (SPDC)
2025Soku Instrument Air Compressor Package Replacement ProjectRenaissance (SPDC)
2025Soku Produced Water Evacuation Loopline, Southbank Pump ProjectRenaissance (SPDC)
2025Phase 2 PDS Design for the Installation of PDS UnitRenaissance (SPDC)
2024Gbaran EPF Optimization ProjectRenaissance (SPDC)
2024Escravos IG-IA ProjectRenaissance (SPDC)
2024Gbaran Gas Cap Blowdown ProjectRenaissance (SPDC)
2023Fire Water Tank Demolition and Reconstruction ProjectWarri Refining & Petrochemicals Company (WRPC)
2023Custody Transfer Metering Project (EPIC)NNPC Gas Infrastructure Company Limited (NGIC)
2023Modification of the Process Cooling Medium and Gas Floatation Unit Systems ProjectMobil Producing Nigeria Unlimited (MPNU)
2022 to 2023Gas Automation System, ERHA FPSORenaissance (SPDC)
2022FEED for Centralized Power Plant for Oredo Production Facilities (OML 111)NNPC E&P Limited (NEPL)
2021Offshore Lateral Pipeline Inline Inspection (ILI) Consultancy & Advisory ServiceWest Africa Gas Pipeline Company Limited (WAPCO)
2020FEED & DED for Rehabilitation Works at Escravos Crude Oil Terminal and IBPWAGL Energy Limited
2018 to 2019LNG Train 7 FEED ProjectNigerian LNG Limited
Commissioned March 2019Akri Flowstation Gas Recovery ProjectNigerian Agip Oil Company
2017Kwale Flaredown ProjectNigerian Agip Oil Company

Project enquiries

Looking for relevant experience or a delivery partner for a similar challenge? Contact our team with the project scope and intended timeline.