Amazon Energy

Overview

Overview

Our engineering services support informed decisions from concept to detailed design. We develop solutions that are practical to procure, construct, operate, and maintain.

Scope of services

  • Conceptual and feasibility studies
  • Concept studies and Pre-FEED
  • Front-end engineering design (FEED)
  • Detailed engineering design (DED)
  • Reverse engineering
  • Construction and site engineering
  • Field development planning
  • Multidisciplinary technical support

Differentiators

  • Designs developed with procurement, construction and operations in mind

  • Direct link to our EPICOM and operations teams

  • Local operating knowledge combined with specialist expertise

Representative projects

NLNG Train 7 FEED ProjectCompleted

Engineering

NLNG Train 7 FEED Project

Nigeria LNG Limited

Challenge
NLNG set out to expand its six-train facility with a seventh liquefaction train, a new common liquefaction unit for excess treated gas from the existing trains, a new export jetty and all brownfield interconnections.
Result
FEED delivered for one of the largest gas projects in Nigeria.

106,086engineering man-hours

Escravos Terminal and IBP Rehabilitation, FEED and DEDCompleted

Engineering

Escravos Terminal and IBP Rehabilitation, FEED and DED

WAGL Energy Limited

Challenge
The existing facilities at the NPSC Escravos Crude Oil Terminal and Import Berth Platform (IBP) needed rehabilitation.
Result
Rehabilitation engineered from a forensic audit of the existing facilities.

FEED + DEDfrom forensic audit to detailed design

Offshore Platform Integrity ProgrammeCompleted

Asset IntegrityEngineering

Offshore Platform Integrity Programme

Mobil Producing Nigeria

Challenge
Ageing offshore platforms needed their structural and production integrity restored.
Result
Restoration engineered and packaged, ready for safe execution offshore.

12offshore platforms

Njaba Field DevelopmentCompleted

Engineering

Njaba Field Development

Addax Petroleum Development

Challenge
Addax planned to drill and produce seven additional wells and needed the facilities to bring them on stream.
Result
A phased development ready to increase production and processing capacity.

7wells tied in to the facilities

Talk to our Engineering team

Tell us about the asset, the challenge and the timeline. We will come back to you.